- Location
- India
- Year
- 2025
- Commercial Model
- CAPEX
- Type
- Ground-Mounted Solar
- Capacity
- 1.10 MWp
- Annual Generation
- 14.5 lakh units / year
- Effective Savings
- ₹13.8 lakh (approx. €12.8K)
Controlled rock excavation, levelling and about 0.5 km of 11 kV HT evacuation, completed in 85 days despite heavy rainfall and a dust-intensive site.
Highlights
- Prepared a difficult site through controlled rock excavation and land levelling before installation began.
- Developed the layout and foundation approach around uneven and rugged ground conditions.
- Designed and executed approximately 0.5 km of 11 kV HT evacuation for reliable grid connection.
- Installed the dedicated HT transmission infrastructure required for safe long-distance power transfer.
- Completed the project in 85 days despite heavy rainfall, remote-site logistics and a dust-intensive operating environment.
- Selected and designed the system for durability in harsh industrial conditions.